Every November we get the same call around Thanksgiving: a shop has had a good year, their accountant told them to buy equipment, and they want a machine running before year-end. It can be done — but only working backwards from December 31, and only on the right machine.
The rule that decides it: placed in service
For 2026, Section 179 lets a business deduct up to $2,560,000 of equipment cost in the year the machine is placed in service, and 100% bonus depreciation is permanent. New and used equipment both qualify, and a financed purchase qualifies too. Talk to your own tax advisor about your specific situation.
The words that matter are “placed in service.” That does not mean you signed a quote or wired a deposit. It means the machine is in your shop, installed, and ready to do its job. A machine still on a truck, in a crate, or being built overseas on December 31 is next year’s deduction, no matter when you paid for it.
What can still make it — and what honestly can’t
In-stock machines can make it. A used machine sitting in our Sutton warehouse, or a new machine already in stock in the U.S. — like the Erbend folders and shear stocked in North Carolina, or GMC machines under their year-end program with free freight in the lower 48 — can be bought, trucked, rigged in, and running in weeks, not months.
A factory order usually can’t. A folder built to order overseas carries a 6-to-9-week lead time from deposit, plus ocean freight, plus install. Ordered today, that math lands in January. We’ll quote you that machine gladly — but we won’t promise a 2026 deduction on a machine that can’t be in service by December 31. Any dealer who does isn’t doing you a favor.
Work backwards: the four dates
- Install date first. Leveling, power, anchoring, and test runs take real time. Our service side — Tony Demaio, ext. 102 — books up in December like everyone else’s.
- Rigging and trucking second. A machine you can’t get through your door isn’t in service. Sort the move, the door, and the slab before the truck loads, not after it arrives.
- Financing third. Financed purchases still qualify, but approvals need days, not hours — start the application with the quote, not after it.
- The decision last — which means now. Six weeks sounds like plenty until you subtract trucking, a holiday week, and an install slot. The shops that make it picked the machine in November.
The plain version
If the deduction matters this year, buy what’s in stock, get the move and the install scheduled this week, and keep the factory-order machine for next year’s plan — bought on its merits, not on a deadline it can’t meet.
Thinking about a machine before year-end? Call Arthur at 508-581-9922 ext. 101, or call/text 508-365-8395, and we’ll tell you straight which machines can be running in your shop by December 31 — and which ones can’t.